I met Michelle and Grant at the Millwater showhome on the 11th September 2018 .
They wanted a large new build on a site suitable to park a largish boat, with the street wide enough to allow access ( many streets aren’t as when cars park either side you can’t get a boat through)
I love a challenge and knew none of our existing sites would fit these requirements, so I set to and found them an 817m2 site for sale privately.
I arranged for Michelle and Grant to view the site and they said it was perfect for them. I then did due diligence in the site, ensuring it was flat, had a good sunny aspect and checked the engineers reports for the soil conditions and the As Built plans for drainage pipes to ensure there would be no problems in the build.
They put a conditional offer in the site and paid us the $5k design deposit and we went straight into a design meeting, drew their concept plan for a single level 248m2 home to their requirements and budget and then priced the job up, so they knew their fixed contract price before committing to the section purchase.
Everything aligned as expected, so they purchased the site and went unconditional on their build with us.
We then completed their working drawings, obtained council consent and started on site on 14 Nov 2018
Their build was completed in 16 weeks from slab down ( 19 weeks from starting on site)
When had a 3 week shut down over Christmas in addition to these weeks.
These clients moved into their beautiful home yesterday 11 April 2019 and are absolutely thrilled with their stunning new home.
Another Generation Home completed both 100 % on time and on budget.
We walk the walk and don’t just talk the talk with our clients.
We complete all builds with passion and a great team effort from all staff.
We would love the opportunity to talk to anyone considering building so they too can experience a fantastic build with the same passion and great outcome.